Project: Greg's_RV-10   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Greg Kochersperger   -  
Project:   Vans - RV-10
Total Hours:1320.9
Total Flight Time:1.1
Start/Last Date:Jan 15, 2021 - No Finish Date
Engine:IO-540
Propeller:TBD
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=Greg's_RV-10

Home or Last Project Picture

Oct 30, 2022     Adjust coax conduit - (0.5 hour)       Category: Avionics
As I was trial fitting the aileron pushrods, I noticed that it directly conflicts with the future coax conduit I had installed in the left wing. In all my wire runs I was conscious of the main pushrod and the belcrank, but wasn't thinking at all about the smaller bell crank to aileron pushrod.

Easy fix. Just popped off the sharkbite clamp and removed the rivets. Moved the clamp on the ribs just inboard and outboard if the bell crank. Re drillled and re riveted. All good now.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.